Candidates who don't find actual CDCS Questions remain unsuccessful in the EXIN CDCS test and lose their resources. That's why BraindumpQuiz is offering real CDCS Questions that are real and can save you from wasting time and money. Hundreds of applicants have studied successfully from our CDCS Latest Questions in one go.
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
>> CDCS Certification Test Questions <<
After using our CDCS learning materials, you will find that things that have been difficult before have become simple. Of course, that's because you are better. Opportunities are for those who are prepared. And our CDCS exam questions are the right tool to help you get prepared. With the most up-to-date knowledage and information of the CDCS Practice Braindumps, you can be capable to deal with all of the conditions in your job. Believe it, good people will be better!
NEW QUESTION # 21
What is the minimum requirement for the power feeds to the building for a Rated-3 data center based on the ANSI/TIA-942 standard?
Answer: B
Explanation:
The minimum requirement for power feeds to a Rated-3 data center according to ANSI/TIA-942 is to have two independent power feeds, which can come from two different substations provided by the same power company. This ensures redundancy and concurrent maintainability, as each feed can support the load independently during maintenance or failure of the other.
Detailed Explanation:
The separation by two substations ensures resilience in case of a localized outage or substation maintenance, aligning with Rated-3 requirements for uninterrupted operation. ANSI/TIA-942 permits these feeds from a single utility provider as long as they are supplied from distinct substations.
EPI Data Center Specialist References:
EPI underscores the importance of dual power feeds from separate substations for Rated-3 facilities, highlighting that the ability to draw from different substations aligns with redundancy requirements for high availability.
NEW QUESTION # 22
What is a potential disadvantage of using water mist as a fire extinguishing system?
Answer: C
Explanation:
A potential disadvantage of using a water mist fire suppression system is that it can rapidly increase the humidity within the data center, which may pose risks to sensitive electronic equipment. Excessive humidity can lead to condensation, which could damage electronics and lead to short circuits or corrosion over time.
Detailed Explanation:
Water mist systems use fine droplets to suppress fires by cooling and displacing heat. However, the moisture generated may raise the humidity level to the point where it exceeds safe operational limits for IT equipment. Therefore, while water mist systems are effective in fire suppression, they may not be ideal in environments where high humidity could damage sensitive equipment.
EPI Data Center Specialist References:
EPI guidelines advise considering the impact of humidity from fire suppression systems, particularly in environments housing electronic equipment. It's essential to weigh the benefits of fire suppression against potential risks to operational equipment when choosing suppression methods.
NEW QUESTION # 23
Do you need to consider bullet (ballistics) protection when designing a data center?
Answer: D
Explanation:
Bullet (ballistics) protection is typically considered only for data centers that are potential targets or located near such targets. While ANSI/TIA-942 does not specifically require bulletproofing for all data centers, it is prudent to consider it based on location risk assessments, especially if the facility is in a high-risk area or near critical infrastructure that could attract threats.
Detailed Explanation:
Protective measures like bulletproofing depend on the threat landscape and the data center's exposure to risks such as crime or terrorism. Assessments for physical security are typically customized based on location-specific risks rather than being universally required by data center standards.
EPI Data Center Specialist References:
EPI guidelines emphasize customizing physical security measures based on threat assessments, suggesting that bulletproofing is appropriate in specific circumstances where the facility's risk profile justifies additional security measures.
NEW QUESTION # 24
You are allowed to use a calculator for this question.
A computer room has a net volume of approximately 2,500 m³ / 88,287 ft³.
The temperature is 20 °C / 68 °F.
The required design concentration is 7%.
The S-Factor is 0.1359 (metric) / 1.885 (imperial).
Calculate the amount of gas required for this computer room based on FM200. What is the correct weight?
Answer: B
Explanation:
The amount of FM200 gas required can be calculated using the formula:
Weight of Gas=Net Volume×Design Concentration×S-Factor ext{Weight of Gas} = ext{Net Volume} imes ext{Design Concentration} imes ext{S-Factor}Weight of Gas=Net Volume×Design Concentration×S-Factor Using metric units:
Net Volume: 2,500 m³
Design Concentration: 7% (or 0.07)
S-Factor: 0.1359
Calculation:
2,500 m3×0.07×0.1359=821.325 kg2,500 , ext{m}